The patented* design features of Mate EasyTap make installation fast and easy. By following the steps described, you will maximize machine up-time and increase your productivity.
1. Prepare for installation
- Confirm oil reservoir cap (1) is installed to prevent oil spillage.
- Remove EasyTap assembly from maintenance stand (2) and turn upside down.
- Remove end cap (3) using two screwdrivers (4) provided.
|
2. Remove length adjustment assembly (5)
- Hold end of tap (10) with thumb and first finger.
- Push length adjustment button (6) to release.
- Remove length adjustment assembly (5) from EasyTap assembly.
|
3. Separate collet and tap assembly (7) from collet holder assembly (8)
- Slide spring-loaded collet release sleeve (9) forward to release collet and tap assembly (7).
- Pull end of tap (10) to remove collet and tap assembly (7) from collet holder assembly (8).
- Release spring-loaded collet release sleeve (9).
|
4. Replace collet and tap assembly (7)
- Hold spring-loaded collet release sleeve (9) with thumb and first finger.
- Insert collet and tap assembly (7) into collet holder assembly (8) engaging lugs on collet (11) with recesses in collet holder assembly (8).
- Release spring-loaded collet release sleeve (9).
- To change tap (10) within collet (11), see steps 8 and 9.
|
5.Replace length adjustment assembly (5)
- Hold tap end with thumb and first finger.
- Align collet holder key (12) with keyway in EasyTap assembly.
- Hold length adjustment button (6) in until length adjustment assembly (5) is fully installed.

|
6. Set Tap Length
- Turn EasyTap assembly upright and insert into maintenance stand (2).
- Push length adjustment button (6) until tip of tap (10) touches stand base plate.
- Release length adjustment button (6).

|
7. Prepare for use
- Remove EasyTap assembly from maintenance stand (2).
- Turn EasyTap assembly upside down.
- Replace end cap (3).
- Turn EasyTap assembly upright.
- Remove oil reservoir cap (1) and refill with hydraulic oil as indicated by site gauge (13). (Use Mobil DTE26 or equivalent.) Note: oil reservoir cap must be removed during normal operation to avoid vacuum build-up.
- Install Mate EasyTap assembly into punch press.
|
8. To Remove the Tap from the Bilz brand collet
- Hold the collet (11) between the thumb and first fingers.
- Depress the spring loaded locking mechanism.
- Remove the tap (10) and release the mechanism.
|
9. To Install the Tap into a Bilz brand collet
- Hold the collet (11) in one hand and the new tap (10) in the other hand.
- Slide the square end of the tap (10) into the collet (11).
- Rotate the tap (10), while pushing the tap into the collet (11), until the square end of the tap engages securely with the square socket within the collet.
- The assembled tap and collet assembly(7) is now ready to use.
|